Fog Hashing C6 Power restoration after outage

Ran into a snag with the C6. Had a power outage because we were working on the panel. When we powered back on, the immersed ASIC’s started right up, but the C6 pump did not. This caused an overheat on all the ASICS and shutdown. I sent email to Fog Hashing, and they said it was designed this way for safety… May be safer for the Fog Hasing system, but is not safe for the mining rigs. They suggested a little Rube-Goldberg remotely controlled to push the button when activated remotely, but it doesn’t address the fact that power restore still requires manual (local or remote) restart of the pump while the mining ASIC’s auto start. Obviously this is not ideal. Wondering if anyone has ideas how to resolve this?